Clayco: projects, trade partners and construction careers

Echelon Reports research | Contractor intelligence

To pursue subcontract work with Clayco, start with its trade-partner qualification page and BuildingConnected plan room. For Rivian’s Georgia campus, use the project registration form to identify your scope and receive invitations as packages are released.[3][33] Qualification, project registration and an invitation to price a package are separate steps.

Clayco’s work spans manufacturing, data centers, power, housing, healthcare and civil construction. The team and project maps below help you choose a route before spending time on an estimate. One important change: Clayco delivered Helios Phase I in Texas, but Galaxy named HITT for Phase II in its August 5, 2026 earnings call.[46] That completed Clayco project remains useful evidence of prefabrication experience, not a Clayco Phase II bid lead.

Workers can go straight to construction careers and training. That section separates experienced field roles from a Rivian-area pre-apprenticeship program.

Editorial and source review: November 7, 2026. Project announcements and recruitment records retain their own dates.

Subcontract packagesRivian: register scope interest.Confirm released packages in BuildingConnected. [33]
Prefabrication and field workHelios: distinguish shop assemblies from site installation.Clayco delivered Phase I; Galaxy named HITT for Phase II. [40][39][46]
Construction careersSEI piping and MEPF commissioning have employer-linked records.Confirm assignment, travel and availability. [41][42]
Different routes lead to different decisions. A project registration form, a delivery case study and a recruitment record do not establish the same kind of opportunity. Checked November 7, 2026.

Which Clayco team fits your work?

Clayco is a privately held design-build and real estate business headquartered in Chicago. Its listed offices also include St. Louis, Greenville, Lenexa, Phoenix, Culver City, Birmingham, Atlanta and Cary, which it labels Raleigh.[1][34] Those offices are contact locations, not a complete project footprint or proof of a local hiring need.

Clayco describes CRG, LJC, Concrete Strategies and Ventana as integrated subsidiaries. The roles below follow those company descriptions; they do not establish each legal entity’s ownership percentage, license coverage or contracting authority.[2]

Team or business Supported role Where to start
Clayco construction Design-build and construction delivery across commercial, institutional, industrial and residential work.[1] Use the trade-partner page for qualification and the linked plan room.
CRG Real estate investment and development platform within Clayco’s integrated-company group.[2] Development interest differs from a construction bid. Start with the integrated-company directory and identify the project developer.
LJC Architecture and design, with engineering brought together under the LJC brand in the January 8, 2026 merger announcement.[21] Use the LJC route in the company directory for design services. Do not assume it awards field packages.
Concrete Strategies Architectural site-cast concrete, structural concrete, flatwork, site utilities and self-performed concrete construction.[2] Workers can use Concrete Strategies careers. Suppliers should identify the concrete team buying the material or service.
Ventana Designs, supplies and installs curtain wall façade systems.[2] Use Ventana’s own prequalification page. Its stated process differs from Clayco’s.
Clayco Systems and Equipment Innovations, or SEI Mechanical, electrical, process and industrial piping work, including design, purchasing and installation, as described in its recruitment record.[41] Identify whether the inquiry concerns an assembly, field installation or an SEI role. The piping superintendent record describes the field work.
Clayco Compute and Power and Energy Compute is the mission-critical group. Power and Energy launched March 4, 2026 with an initial focus on utility-scale solar and energy storage.[10][18] Match data-center work to Compute; use the Power and Energy announcement to understand the newer unit’s scope.

Clayco expanded its self-perform leadership in January 2026 and launched Power and Energy in March.[22][18] The January 8 announcement names Clayco Design & Engineering Inc. and The Lamar Johnson Collaborative as the merging businesses. It says the engineering team of more than 100 would join LJC.[21] That is a dated organizational change, not an independently checked legal merger filing. Compute, SEI and Power and Energy are presented here as operating teams, not presumed separate corporations.

Project, scope and action map

Use this selected map to decide where your experience fits. The final column recommends a next step; it does not certify an available subcontract. Completed buildings remain useful evidence of capability, but they should not consume the same estimating effort as a released package.

Project and place Documented team and scope Status and useful next step
Rivian EV campus, Stanton Springs North, Georgia CJ Adventures is the Clayco–JE Dunn joint venture. Clayco names stamping, body, paint, assembly, battery/drive-unit space, utilities and wastewater treatment. CJ Adventures and LJC have design-build paint-shop and civil scopes.[23] Register project interest. The page says invitations come through BuildingConnected and requires Clayco prequalification. Its 2025–2026 procurement milestones are planning windows, not current package deadlines.[33]
Project Jupiter, also called Project Miner on Clayco’s page, Doña Ana County, New Mexico Clayco and Kiewit New Mexico Co. are the general-contractor joint venture for an 855,000-square-foot portion. The page records August 2025 selection and an October 2026 topping out.[12] Ask which JV purchasing process controls your package through Clayco’s project/bid contacts. The stated role covers a portion of the campus, not every building or power-system contract.
Galaxy Helios conversion, Afton, Texas Clayco describes a 133 MW liquid-cooled initial phase, with power assemblies, chillers, piping, concrete upgrades and structural steel. Its SEI account describes extensive off-site fabrication.[36][40] Galaxy announced delivery of Phase I on July 6, 2026.[39] Its August 5 earnings call names HITT as the Phase II general contractor, replacing Clayco for that phase.[46] Treat Clayco’s conversion as completed experience; identify the phase’s buyer before seeking later work.
ENTEK separator plant, Terre Haute, Indiana Clayco’s portfolio describes design-build work across about 1.4 million square feet and self-performed foundations, flatwork, tilt-up panels and paving.[24] Use Clayco’s trade-partner route to ask about remaining scopes. The undated page’s projected 400-worker peak is not a current crew count or hiring total.
Life Time Living at PV, Phoenix, Arizona Clayco is builder and LJC designer. The August 4, 2026 announcement records topping out of an 11-story, 327-unit residential building.[26] Relevant experience includes multifamily construction and building systems. Use Clayco’s project contact to ask about remaining packages. The announcement quotes a 2027 opening target; actual completion is not established here.
SIUE Health Sciences Complex, Edwardsville, Illinois The university names the Clayco–Poettker design-build JV, LJC and Christner, with HOK as bridging firm.[15] The university’s April 28, 2026 account describes the completed facility. Treat it as academic/laboratory experience, not an active construction bid. See the source-size discrepancy below.
Cook County Central Campus Health Center, Chicago Clayco describes its developer/design-builder role on the 9-story, 282,000-square-foot center. The scope includes clinics, offices, road changes and relocation of the oxygen tank farm.[13] Historical healthcare capability. The project page identifies design partners and systems; it is not an invitation to bid.
O’Hare airfield basin modifications, Chicago Clayco’s portfolio describes eight critical-path scopes, including temporary taxiways, utility relocations and roadway tunnels.[37] Aviation and civil experience extends beyond buildings. Use the project page as a scope reference; its undated text does not establish today’s contract or procurement status.

For the New Mexico campus’s permits and wider contractor context, read Echelon’s Project Jupiter report. The Kiewit company report explains the other JV partner’s broader work. These are related reports, not substitutes for the JV’s bid documents.

The SIUE sources disagree on size and design credits. Clayco’s portfolio says 215,000 square feet and names LJC and CannonDesign as lead architects; the university’s April 28 account says 172,495 square feet and names LJC and Christner.[14][15] This report follows the university for the completion account and team shown in the map. It does not select a single building area or assume the two sources measure the same scope.

Why prefabrication changes the opportunity

Helios shows why a campus’s scale alone is a poor guide to field work. Clayco says SEI manufactured and tested electrical houses off-site before delivery, alongside chiller skids and modular pipe racks.[40] That creates different opportunities for equipment suppliers, fabrication shops, transport firms and site installers. A contractor should ask where fabrication ends and field connection, testing and commissioning begin.

Clayco’s Helios account also describes a peak workforce of about 1,350 and temporary housing and RV accommodation.[40] Those are retrospective project claims, not travel benefits offered to a new applicant. The same page gives conflicting chiller-skid counts: 96 in a graphic and 95 in its narrative. We retain the supported prefabrication finding without selecting one of those counts.

The Power and Energy launch widens the work mix further. On March 4, Clayco said it had an Illinois solar-and-storage project under contract and in design, with mobilization planned for 2026. It forecast $300 million in unit revenue and nearly 1,000 craft professionals by 2027.[18] Neither forecast is an achieved result or an available-job count. Construction Dive’s March 13 interview with CEO Anthony Johnson adds the strategic context: the unit targets utilities, power producers and manufacturing clients as well as data centers.[9]

Keep that operating business separate from Clayco’s Deep Atomic consortium work. Its February 12 announcement describes early delivery planning and constructability support for DOE submissions, including a proposed Idaho National Laboratory campus pending approval.[19] It does not establish a nuclear construction award. This distinction matters if your firm is choosing between qualifying for near-term solar work and following a proposed nuclear-powered campus.

How to qualify and find bid invitations

Start with Clayco’s subcontractor and vendor page. It links a contractor profile and the Clayco Public Plan Room, which requires a BuildingConnected profile.[3] This review did not access an authenticated plan room or verify an individual open package.

Read the linked prequalification policy before preparing documents. It says registration has no vendor fee. Required material includes company locations, scopes, certifications/licensing and insurance; onsite work also calls for current-year EMR and OSHA 300/300A logs. Clayco reserves the right to request financial information and says review can take up to two weeks.[4]

The landing page says qualification is needed once a year, but the policy is more specific: it can be required annually, per state, per project or otherwise. When annual approval applies, it lasts one year and renewal notices go out two months before expiration.[3][4] Plan around the policy and the actual project’s requirements, rather than assuming one approval clears every assignment.

Rivian has a more useful project-specific starting point. Its registration form lists civil/site work, concrete, steel, roofing, glazing, mechanical, controls, electrical, plumbing, fire protection, fire alarm, network/low-voltage/security and commissioning among its package interests.[33] Select the scope you can support and describe the relevant work history. Registration expresses interest; the invitation and package documents establish what is being bought and when.

Ventana publishes a different route. Its subcontractor page asks for a contractor profile and says firms accepted as potential preferred bidders receive notice to complete FirstVerify qualification.[7] Do not assume Clayco’s BuildingConnected process replaces that step.

Check the contract before pricing

Free prequalification does not mean every contract process is free. Clayco’s public subcontract form has project-specific fields for the contracting entity, retainage, bonds and insurance. Its terms are labeled Version 06.02.2026, although the first page also carries the older header “Subcontract 2025 06 20.”[47] Obtain the version issued with your package, including its exhibits and prime-contract requirements.

Section 5.3 puts required electronic billing and waiver software at the subcontractor’s expense. Section 5.17 makes owner payment a condition of payment to the subcontractor, to the extent permitted by law, and expressly assigns the risk of owner nonpayment to the subcontractor.[47] Review that exposure with your adviser under the project’s state law. This public form does not establish your negotiated terms or Clayco’s actual payment performance.

Use this bid-screen worksheet with the project map. Copy the questions into your estimate notes and record the document, date and person confirming each answer. Leave unknown items marked “unconfirmed” until the buyer responds.

Decision Record before committing Why it matters here
Which buyer and phase? Legal contracting entity, JV, project and phase Helios Phase II has a different GC from Phase I.[46]
What work is being bought? Released package, addenda, due date and required early actions Rivian’s registration page gives planning windows, not a current bid deadline.[33]
Where does your scope start? Shop fabrication, delivery, field installation, testing and handover boundaries Helios used off-site assemblies; a campus total does not describe a field package.[40]
Which qualification applies? Clayco or affiliate process, approval date and project/state conditions Clayco’s policy allows more than annual review; Ventana has a separate route.[4][7]
Can you carry the contract? Payment conditions, retainage, bonds, insurance, software costs and required notices The public form leaves project terms to be completed and includes owner-payment risk.[47]

Construction careers and field roles

Workers should use employer routes rather than the subcontractor form. Start with Clayco’s professional job board, Concrete Strategies careers, or Ventana careers.[38][6][31]

Concrete Strategies’ embedded careers page includes skilled trades alongside management, engineering and administrative work.[29]

For people entering the trades near Rivian’s Georgia campus, Clayco’s October 6 announcement describes the first of three planned cohorts: 24 local residents in a fully funded, 20-day pre-apprenticeship run by Construction Ready.[44] Start at Construction Ready’s training page, which directs applicants to an information session before enrollment.[45] Ask about the next local cohort, eligibility and available seats. The October announcement is not an open enrollment deadline or a promised Rivian job.

The following employer-linked records were read on November 6, 2026; their embedded descriptions and dates were rechecked November 7. They illustrate different qualification levels, not a count of unfilled jobs. None of these descriptions names a project in the map above.

Role and official record Requirements and travel Pay and record date
SEI – Senior Piping Superintendent, Birmingham, Alabama High school diploma/equivalent and OSHA 30 required. The posting calls for 12–20+ years in industrial process piping and at least five years in superintendent/equivalent leadership. CWI and NCCER/equivalent training are preferred. Nationwide travel or temporary relocation may be required; background check and drug testing apply.[41] No numerical pay range in the reviewed description. JobPosting datePosted: November 6, 2026; validThrough: December 21, 2026.[41]
MEPF Field Commissioning Technician, Culver City, California Five-plus years in commercial/industrial commissioning on projects of $30 million-plus, with design-build experience ideal. Building automation controls knowledge and nationwide travel are specified. Duties span construction, acceptance testing, integrated testing, closeout and warranty.[42] Advertised nationwide range: approximately $75,000–$95,000 +/- annually, not adjusted for location. JobPosting datePosted: October 28, 2026; validThrough: December 12, 2026.[42]
Project Engineer – Life Sciences, Indianapolis, Indiana Relevant bachelor’s degree, zero to five years managing construction projects and prior successful project-team experience. Site-based work across a multi-state region can include nationwide travel. Background check and drug testing apply.[43] No numerical pay range in the reviewed description. The page still displayed Apply Now, but its JobPosting validThrough was October 3, 2025, following datePosted August 19, 2025. Availability is unresolved; confirm through Clayco before relying on it.[43]

The life-sciences record is a useful warning about the board, not a confirmed live opening. Visible application controls and expired structured dates can coexist. The other two records have later validity dates, but those dates still do not confirm remaining headcount. We inspected the descriptions and application buttons without submitting personal information.

Clayco’s careers notice says it never requests candidate funds and does not conduct recruiting interviews through SMS or chat platforms such as WhatsApp or Telegram.[5] Use the official employer routes to verify an offer. Obtain the actual employer, worksite, schedule, travel arrangement and compensation before committing to a move.

Ownership and company figures

Clayco identifies itself as privately owned. Forbes’ Robert Clark profile, last updated September 15, 2026, says the founder and executive chairman owns most of the company. Clayco separately identifies Anthony Johnson as CEO and shareholder.[1][16][20] Together, those sources support reported founder majority ownership with management participation. They do not supply a verified shareholder register, exact equity percentages or evidence of a broad employee-ownership plan.

Company size figures need similar care. Clayco’s overview currently labels revenue as more than $8.1 billion for 2025 and says it has more than 4,000 employees.[1] Its March 4 release used more than $7.6 billion for 2025, while the August 4 Life Time release labeled $8.1 billion as 2024 revenue.[18][26] These are inconsistent company disclosures. We do not calculate growth or select an audited revenue figure from them. Office locations, company headcount and individual recruitment records also describe different populations.

Research method and next step

This report combines company portfolios, dated announcements, Galaxy owner releases and an earnings-call transcript, university reporting, an executive interview, employer-linked recruitment records and official qualification and contract documents. It covers selected U.S. projects across data centers, manufacturing, power, residential, healthcare, education and aviation. It is not a complete subsidiary census, backlog, credit assessment or license audit. Undated portfolios establish described experience; they do not reset a project’s schedule to the research date.

For subcontractors, use the bid-screen questions to narrow the project and buyer, then start with the Rivian route when that work fits or Clayco’s qualification page for broader participation. For field professionals, compare the role requirements with your experience and confirm the assignment directly. Echelon’s data-center project index provides wider project context.

For a correction or to supply additional information, email Mike Warner at Echelon Reports with the company or project name, the relevant date and a public document or attributable source. We verify contributions before adding them.

Sources

Back to article index

Echelon Trades Jobs

Hiring or looking for work in the trades?

Employers can submit an opening for review. Tradespeople can tell us what work they want. Both are free, and worker profiles stay private.

Post a free job Tell us what work you want

Visit Echelon Trades Jobs