Trenchless construction is not one occupation. CIPP and sliplining rehabilitate existing pipe; pipe bursting replaces it along its route. HDD, auger boring and microtunneling install pipe through a bore or tunnel.[1][2][3] The method tells you what happens to the pipe. The job description tells you what you would do.
For example, Sewer Pro describes lining and pipe-bursting equipment support, while Bradshaw’s historical microtunnel boring machine (MTBM) operator description calls for five years of MTBM experience.[11][12] Those are different assignments, even though both fall under trenchless construction.
This US worker guide compares selected methods, documented contractor capabilities and actual role descriptions. Use it to narrow your specialty search and compare an employer’s answers. It is not a guide to selecting a construction method for a site.
Compare six trenchless construction methods
Start with what happens to the pipe. The contractor labels below are suggested search terms, not official trade classifications or a standard crew roster. Each project needs its own engineering review before a method is selected.[4]
| Method | What happens to the pipe | Contractor capability to look for | Work involved |
|---|---|---|---|
| Cured-in-place pipe (CIPP) | A resin-bearing flexible liner cures inside the existing pipe.[2] | Pipeline rehabilitation with the specified CIPP system | Cleaning and inspection, liner installation and curing. Connections and flow arrangements also need attention.[2] |
| Conventional sliplining | A smaller pipe or liner goes inside the existing pipe. The space between them is typically grouted.[2] | Sliplining and pipe handling | Inserting the pipe, treating the space around it and reconnecting services. An insertion pit can be necessary.[2] |
| Pipe bursting | A bursting tool breaks the old pipe outward while replacement pipe follows along its route.[3] | Utility replacement using pipe bursting | Equipment and pipe handling, access pits where needed, flow arrangements and reconnections.[3] |
| Horizontal directional drilling (HDD) | A steerable bore is drilled and enlarged, then the pipe is pulled through.[1] | Directional drilling for the specified utility and crossing | Drilling, tracking the bore, managing drilling fluid and pulling the pipe into place.[1] |
| Auger boring | A rotating head excavates a cased bore between a drive pit and a reception pit.[1] | Auger boring for a cased crossing | Handling casing and augers, excavation and removal of spoil back to the drive pit.[1] |
| Microtunneling | Remotely controlled excavation works with pipe jacking to advance the pipeline between shafts.[1][5] | Microtunneling with the specified excavation and guidance system | Machine control, pipe handling and jacking, plus shaft and surface-equipment work.[1][5] |
These are work packages, not assignments to a single person. Ask which tasks the employer performs itself and which belong to a subcontractor.
Lining and bursting are different specialties
CIPP forms a liner inside the host pipe; conventional sliplining inserts a smaller pipe or liner. Neither is the same process as breaking the old pipe outward to make room for its replacement.[2][3] Do not assume that a company advertising one method also performs the others.
Pipe bursting can replace a pipe with one of the same size or, where the project permits, a larger one. Ground conditions, nearby services and obstructions can restrict the work.[3] Likewise, a smaller slipliner does not tell you the final flow capacity by itself. The EPA calls for evaluating both diameter reduction and the effect of a smoother interior.[2]
For the inspection and rehabilitation side of the work, see sewer rehabilitation jobs and contractors.
Microtunneling is not another name for all pipe jacking
Pipe jacking describes how jacks push pipe from a drive shaft toward a reception shaft. Microtunneling combines pipe jacking with remotely controlled excavation.[1][5] A contractor’s use of the words “pipe jacking” alone does not identify the complete machine, guidance system or crew duties.
Auger boring forms a cased bore, with spoil removed back to the drive pit.[1] If a job description says “jack and bore,” ask which equipment and method it means rather than assuming a microtunneling assignment.
Compare the work and requirements, not just the method
The four descriptions below show how assignments differ. They are not verified vacancies or a standard crew roster. Required experience, preferred credentials and offered training are separate questions.
| Role and work | Experience and credentials in the record | Location and travel | Evidence status |
|---|---|---|---|
| SAK TV Tech/Tap Cutter: robotic equipment and reopening service laterals after rehabilitation.[10] | CIPP tap-cutter/TV-tech experience, valid driver’s license and diploma or equivalent. The record separately discusses training toward a CDL.[10] | Travel as needed. Phoenix in the summary conflicts with Baltimore/Atlantic Region in the body.[10] | Closed role record. Useful for understanding a specialty, not a current location or training vacancy.[10] |
| Sewer Pro Labor Support Tech: prepares materials and equipment, assists lining/video crews, and sets up CIPP or pipe-bursting equipment.[11] | Outdoor construction or physical-labor experience requested; diploma or equivalent preferred. Setup support does not establish responsibility for operating the bursting machine.[11] | Wooster, Ohio dispatch and statewide travel. Out-of-town work, overtime and confined-space work are included.[11] | Employer description. Current availability and linked application workflows are unverified.[11] |
| Team Fishel Directional Drill Locator: locates drill heads, communicates with the drill operator and runs support equipment.[14] | At least two years of HDD experience. CDL desirable; willingness to travel a plus.[14] | Chandler, Arizona; general utility construction, not a confirmed water-project assignment.[14] | Locator record. Its application link reached an intermediate continue screen; the final form and unfilled headcount were not verified. |
| Bradshaw MTBM operator: system assembly, connection testing, line and grade, jacking records and machine maintenance.[12] | Five years of MTBM operator experience; mechanics, hydraulics and electronics knowledge; valid driver’s license and good driving record.[12] | Historical terms: Eastern United States and 90% travel. Underground/confined-space work is included.[12] | Operator PDF has 2018 file metadata; the careers listing is dated September 28, 2021. Historical duties, not a current vacancy.[12][13] |
Sewer Pro’s support role still requests prior physical-labor or outdoor-construction experience. Bradshaw’s operator example requires substantial machine experience.[11][12] Do not read a support title as a promise of entry-level training or an operator title as proof that another specialty’s experience will qualify you.
This sample has no dedicated sliplining or auger-boring role description. Its pipe-bursting example covers setup and support, not a full bursting-operator assignment. The six methods are a selected orientation, not every trenchless technique or a complete career ladder.
For a fuller comparison of drilling roles and credentials, use the HDD jobs guide.
Contractors that document these capabilities
These four examples show how to investigate a contractor’s published scope. They are not rankings, an approved-bidder list or a national directory. The evidence comes from the companies themselves, not independent owner confirmation. It does not establish available crews, current hiring or service in every market.
| Contractor | Published capability or project example | What to verify next |
|---|---|---|
| SAK Construction | Lists CIPP, sliplining and bypass services.[6] | Which rehabilitation crew and system would the assignment involve? |
| Murphy Pipeline Contractors | Describes static pipe bursting for force-main replacement.[7] | Is the local assignment bursting, pipe handling, reconnection or another part of the work? |
| Michels Trenchless, Inc. | Lists HDD, microtunneling and auger boring in its construction and installation navigation.[8] | Confirm the operating company and exact method. The detailed installation page was inaccessible during review, so auger boring is supported here only by the service listing. |
| Bradshaw Construction Corporation | Its Allen’s Creek project account describes microtunneling casing for a St. Petersburg water transmission main.[9] | Ask about comparable current projects and the crew needed. This is a contractor-authored project account, not proof of a current assignment. |
The role comparison above includes Sewer Pro and Team Fishel as additional employers. They are not identified as employees or subcontractors of these companies. Ask the specific office which method and crew it needs; a company-wide service menu does not answer that question.
Trenchless still involves excavation and site work
Sliplining can need an insertion pit. Pipe bursting can need access pits and service reconnections. Microtunneling requires launch and reception excavations, with equipment and pipe handling at the surface.[1][2][3]
Portland’s public explanation also includes backfilling pits, inspections and pavement restoration.[5]
For a worker, the practical question is how much of the assignment involves the named machine and how much involves support work. Ask about excavation, material handling, traffic controls and cleanup rather than assuming “trenchless” means working only at the controls. Sewer Pro’s support description shows several of those duties in one role.[11]
For related excavation work, read the hydro excavation jobs guide.
Cost and suitability remain project-specific. Caltrans identifies difficult ground and insufficient equipment space as reasons trenchless work can be less practical or more expensive than an open trench.[1] The EPA’s sewer guidance also identifies host-pipe defects, diameter, grade, access, bypass needs and nearby utilities as factors.[2] This guide does not select a method for a site or establish that a sewer-lining system is approved for drinking-water use.
Compare two trenchless assignments
Copy this table into your notes and complete it from an employer conversation. Keep the current job description beside it. Leave unanswered cells blank rather than treating missing terms as a promise.
| Decision to record | Assignment A | Assignment B |
|---|---|---|
| Method, utility and tasks I would perform versus assist with | ||
| Required before starting, preferred credentials, and any training conditions | ||
| Reporting location, travel schedule and travel costs covered | ||
| Pay and unit, shift pattern and overtime terms | ||
| Who confirmed availability, when, and where the terms are recorded |
Make the first row specific. For CIPP, ask whether you would prepare liner, support inspection or reinstate laterals. For bursting, separate equipment setup from machine operation. For HDD, separate locating from drilling. For microtunneling, separate machine control from shaft or surface support. Those distinctions reflect the different duties in the descriptions above.[10][11][12]
For an HDD locator example, Team Fishel explicitly describes communication with the drill operator rather than treating the two as the same role.[14]
For sliplining or auger boring, request the employer’s own task breakdown: the method description alone does not establish your assignment. Ask who trains and supervises you on unfamiliar work. These are discussion prompts, not equipment-operation or confined-space instructions.
A contractor evaluating these companies needs a separate check: who performs each part of the specified work, and what comparable project evidence supports that capability? Use the linked technical sources with the project team rather than treating this worker comparison as an engineering recommendation.
Tell Echelon which underground work interests you
Use a private worker-interest profile to describe your market, trenchless experience, credentials and travel preferences. This is not an employer application. Sharing your profile requires separate permission naming the employer or recruiting partner.
Submit a private worker-interest profile
Employers can submit a role for review. Submission does not guarantee publication or a candidate match.
Sources, updates and corrections
Research reviewed November 5, 2026. Technical references include Caltrans’ January 2026 manual, NASTT guidance and Portland’s public explanation. The EPA documents date to 1999 and 2006; they support basic mechanisms and constraints here, not current prices, product approvals or production rates. Company evidence describes published capabilities and particular roles, not a complete crew roster or ownership investigation.
This guide is part of Water & Underground Infrastructure. For a correction or to supply additional information, email mike@echelonreports.com with the company, method, source link and changed detail. Do not send sensitive personal information.
Sources
- Caltrans Geotechnical Manual: Trenchless Construction
- EPA 832-F-99-032: Trenchless Sewer Rehabilitation
- EPA 832-F-06-030: Water Technology Fact Sheet, Pipe Bursting
- Trenchless Technology Overview Guide – Rehabilitation page 1
- Microtunneling | Portland.gov
- SAK Construction: capabilities
- Murphy Pipeline Contractors: pipe bursting
- Michels Trenchless, Inc.: capabilities
- Bradshaw Construction: microtunneling projects
- SAK: TV Tech/Tap Cutter, closed role
- Sewer Pro: Labor Support Tech description
- Bradshaw: MTBM operator description
- Bradshaw: careers
- Team Fishel: Directional Drill Locator