Rosendin offers two distinct routes for subcontractors and suppliers: electrical construction through Rosendin Electric and offsite manufacturing through Modular Power Solutions (MPS). Both sit under Rosendin Holdings.[2][3]
Rosendin directs invited subcontractors to Highwire, while MPS has a supply-chain partnership page.[4][41] Match your work to the business issuing the order, then confirm its qualification and invoice requirements.
Use Rosendin’s trade-partner instructions for invited or awarded work.[4] For an introduction, start with the office directory or general inquiry page.[5][15] An introduction, a qualification assessment and a project invitation are separate steps.
This guide covers selected electrical projects, supplier billing rules and a reusable order-screening record. Electricians and new entrants can go to craft careers and apprenticeships. Research reviewed November 7, 2026. Project dates refer to the underlying evidence, not a new site inspection.
Which Rosendin business fits your work?
Rosendin says its employee ownership began in 1992 and the transaction was completed in 2000, when it became 100 percent employee-owned. Its Employee Stock Ownership Plan, or ESOP, holds employee accounts in a trust. The company’s explanation refers to eligible employees becoming beneficial owners, not automatic shares for every person working on a Rosendin site.[1]
The January 28, 2026 announcement identifies Rosendin Holdings as the parent of Rosendin Electric and MPS.[2] It names Keith Douglas as CEO. Paolo Degrassi and Justin Tinoco are presidents.[2] This is a group structure, not evidence that Holdings signs every field contract.
| Name or business | Documented relationship and work | Use it to route an inquiry |
|---|---|---|
| Rosendin Electric, Inc. | Electrical construction operating company under Rosendin Holdings, Inc.[2] | Identify the regional office, project and installation scope. |
| Modular Power Solutions | Wholly owned Holdings subsidiary, founded in 2011. Its work includes engineering, product development and deployment. The supplier guide uses the legal name Modular Power Solutions, LLC.[3][32] | Use the MPS supplier partnership page for materials, equipment and specialty services. Its form lists Steel, Rigging, Cable, Wiring and Other, with a Supply Chain Manager contact.[41] |
| Energy Group / Renewable Energy Group | The current Energy page describes EPC, meaning engineering, procurement and construction. Arevon’s January 2022 release calls Renewable Energy Group a division of Rosendin.[9][11] | Match the inquiry to solar, storage, substations or transmission. Do not treat a group label as a separate legal buyer. |
| Project joint ventures | Rosendin’s SoFi account identifies the Rosendin-Meadows Joint Venture. Its supplier guide separately lists Rosendin Meadows Joint Venture, Rosendin Cherry City Joint Venture and Rosendin Redwood JV.[17][32] | Copy the exact entity from the issued agreement or order. A past JV’s name does not identify the buyer on another project. |
The supplier guide also lists Rosendin Construction Puerto Rico, LLC.[32] That is evidence of a named billing entity. It does not confirm the firm’s current registration, ownership share or project activity. The table maps business roles; it is not a complete entity or license census.
MPS publishes a supplier partnership page for materials, equipment and specialty services. It provides a supply-chain contact and an inquiry form.[41] Its general contact page lists service choices. Its location list includes Texas facilities and Mt. Juliet, Tennessee. A factory order can involve different delivery, receiving and installation responsibilities than a field subcontract.[26] Ask which business will issue the order before quoting freight or allocating production time.
Rosendin’s office directory provides regional contacts. These include California, Arizona, Texas, the Pacific Northwest and the Mid-Atlantic.[15] Confirm the destination before visiting a Phoenix-area office. On May 14, 2026, Rosendin announced a building purchase for a future Chandler regional headquarters.[25] The inspected directory still lists Phoenix and Tempe addresses.[15] The announcement does not establish that the move is complete.
What the project record shows beyond data centers
Rosendin’s semiconductor page describes greenfield infrastructure, cleanroom construction and tool installation.[8] It also lists electrical work for chemical delivery, wastewater treatment, ultrapure water, bulk gas and instrumentation.[8] Project locations include Chandler, North Phoenix, Taylor, Boise, Manassas and Hillsboro.[8] The page does not assign each scope to each location or name the confidential customers.
Its energy practice covers high-voltage substations, battery energy storage systems, transmission and solar, with services extending through commissioning and startup.[9] The selected examples below show different delivery roles. A portfolio entry is useful evidence of experience; it is not an available bid package.
| Project and market | Supported Rosendin role | Evidence date and limit |
|---|---|---|
| Abilene AI campus, Texas | Crusoe names Rosendin alongside DPR and Southland as “MultiPrimes.”[33] | December 22, 2025 announcement. The roster does not allocate Rosendin’s buildings or electrical packages, or assign it to a separate later campus. |
| MAZ Mesa Data Center, Arizona | Rosendin lists engineering, building information modeling and design-build delivery; DPR Construction is the named general contractor.[20] | Undated portfolio page. Its “Ongoing” label has no dated progress measure; the client is confidential. |
| UCSF Parnassus Hospital, San Francisco | Rosendin lists building information modeling and design-assist.[10] Boldt identifies the hospital construction partnership as Herrero Boldt Webcor.[37] | Rosendin’s undated portfolio abbreviates the GC as Herrero-Boldt Joint Venture. Boldt’s November 9, 2020 announcement includes Webcor. Confirm the contracting party for any specific package. |
| UC Davis Aggie Square, Sacramento | Rosendin lists design-assist and building information modeling for the biotech/commercial development, with Whiting-Turner as general contractor.[19] | Undated portfolio page. Its scope narrative includes labs, classrooms and startup offices; it is not a current solicitation. |
| Valley Metro Tempe Streetcar, Arizona | Rosendin describes duct bank, electrical and grounding work, including power for 14 stations. Stacy and Witbeck is the named general contractor.[18] | Rosendin dates its field work from fall 2018 to scope completion in early 2021. This is completed-scope experience. |
| SoFi Stadium, Inglewood, California | Rosendin-Meadows JV installed electrical systems, including power for the roof lighting and operations. Rosendin labels its delivery method design-assist.[17] | Historical project account with 2019–2020 installation milestones. The electrical JV is distinct from the Turner/AECOM-Hunt general-contractor team. |
| Townsite Solar-plus-Storage, Boulder City, Nevada | Arevon and Rosendin announced project completion together. The owner identifies Rosendin’s Renewable Energy Group and local IBEW craft participation.[11] | January 13, 2022 release, describing a January 11 ribbon-cutting. Completed solar/storage experience, not a new construction lead. |
For the broader campus and its separate development phases, use Echelon’s Abilene Stargate contractor report. The DPR company guide explains that general contractor’s own qualification and supplier routes; it does not replace Rosendin’s process. The Turner Construction guide helps distinguish Turner from Whiting-Turner, the different firm named at Aggie Square.
Subcontractor qualification: follow the invited-work route
Rosendin’s trade-partner page addresses subcontractors invited to bid or already working on its projects. Existing Highwire users should add Rosendin as a Hiring Partner; new users follow the enrollment process. The published requirements include financial statements, insurance information, safety manuals and OSHA 300A forms.[4]
Prepare those records before opening an assessment, but obtain the project’s actual requirements from the team reviewing your firm. Rosendin says some Highwire documents require annual updates and other information should be reviewed quarterly. That is not a single annual expiration date for every qualification.[4]
Highwire offers a free Network profile for firms exploring connections. Its enrollment guide separates that profile from a client-directed assessment, which requires a recurring subscription.[27] Pricing depends on the assessment package the client requires and the contractor’s employee headcount.[28] Confirm the price before subscribing. A free discovery profile is not a completed Rosendin assessment.
Use the Vendor Risk Management contact published on Rosendin’s trade-partner page for Rosendin enrollment questions. Highwire support handles application-use questions. Neither contact should be presented as the buyer for an unidentified package.[4] If you have not received an invitation, introduce your capability through the office or inquiry route and ask which project team should review it.
Material suppliers should describe whether their quote includes installation, testing or startup. The reviewed public instructions do not establish a blanket supplier exemption from assessment. MPS’s supply-chain route is relevant to its manufacturing business, but it is not a public list of open orders.[26] Keep sensitive financial records within the official requested process rather than sending them with an unsolicited capability sheet.
Suppliers: settle the order and invoice rules before shipment
Rosendin’s accounts-payable page still says August 20, 2018, but links to a supplier guide whose opening says July 18, 2022.[39][32] The linked guide itself mixes old and new instructions. Section 3 adds new purchase-order formats for orders issued on or after September 8, 2025. Later FAQ 24 still shows only the legacy formats.[32] Use the issued order and resolve that conflict with the buyer. Do not change an identifier to fit an old example.
Section 1 states “net 30th PROX” unless otherwise negotiated, with the 25th as the monthly cutoff.[32] Invoices received on the 26th become the following month’s business. An invoice rejected for errors does not count as received until corrected.[32] This is not a promise of payment 30 days after your invoice date. Confirm the due-date calculation and any negotiated exception in writing.
The same guide requires the correct bill-to entity and order reference. Section 4 specifies one purchase order per invoice, one invoice per email and one invoice per PDF, with a 1 MB email limit. FAQ 13 contradicts itself: its first instruction allows separate attachments in a single email, while its example directs separate emails. Section 4 and FAQ 10 both require one invoice per email.[32] If your billing system cannot meet the stated format, obtain instructions before submission.[32]
Subcontract invoices follow a separate path. Section 5 and FAQ 17 say subcontract purchase orders are outside the automated supplier-invoice capture process and identify the Subcontracts Department route. Do not send a subcontract pay application to a material-supplier invoice mailbox simply because both agreements concern the same site.[32]
The guide also identifies electronic VISA payment through Commerce Bank as the preferred method and says no ACH option is available. It says Rosendin and Commerce Bank do not charge for that service, but directs suppliers to check with their merchant-services provider.[32] Confirm the method and any processing costs before pricing the order.
These are published administrative instructions, not a company payment rating or a finding about enforceability. The current signed order, subcontract, applicable law and written buyer instructions govern your transaction. The guide is linked here for screening; its mixed revision dates warrant confirmation before reliance.
A package-screen record to copy
Record a document, named company contact and confirmation date for each answer. Leave an unresolved answer marked “unknown” rather than converting a project announcement into an estimating commitment. This is a planning worksheet, not a Rosendin application or an interactive form.
| Question | Source-backed reason | Record before committing |
|---|---|---|
| Who signs and pays? | Holdings, Rosendin Electric, MPS and named JVs are different relationships in the company and billing records.[2][32] | Legal buyer, order or agreement number, bill-to entity and confirming document. |
| What phase and scope are released? | Abilene’s owner roster names multiprimes without assigning individual packages.[33] | Project, building, phase, scope boundaries, invitation and first required action. |
| Is this factory supply, field installation or both? | MPS offers manufacturing, testing, receiving and commissioning support; Rosendin also performs field construction.[2][26] | Delivery point, freight, storage, installation, testing and acceptance responsibilities. |
| Which qualification applies? | Rosendin directs invited firms to Highwire; the provider separates Network discovery from assessments.[4][27] | Hiring Partner, required assessment, cost, supporting-document dates and project approval. |
| How will the invoice become payable? | The supplier guide distinguishes entity mailboxes, order formats, monthly cutoff and subcontract billing.[32] | Accepted order identifier, invoice route, backup, payment method, merchant charges, discounts, cutoff, due-date interpretation and negotiated exceptions. |
Worked example: a modular-equipment quote
Suppose your firm supplies cable assemblies for an MPS manufacturing order and is also asked to price field installation. This is an illustrative inquiry, not a reported live order. Use the record above to separate the supply quote from the installation agreement.
The guide’s own example for a new MPS purchase order is MPS1234567, while its new Rosendin Electric example is REI1234567. Both apply to orders issued on or after September 8, 2025.[32] Copy the issued identifier exactly. Do not remove the MPS prefix because FAQ 24 still shows only older formats. Request written clarification of any mismatch before billing.
Record the MPS supply order under its exact bill-to entity, with its delivery and acceptance terms. Keep field installation marked “buyer and agreement unknown” until the project team issues the applicable documents. If that work uses a subcontract agreement, the guide sends its invoices to the Subcontracts Department rather than automated supplier capture.[32]
The cutoff changes the billing record too. An otherwise acceptable invoice received by Accounts Payable on November 25 falls within November business under the published rule; one received on November 26 falls into December business.[32] Those are hypothetical receipt dates, not calculated payment dates. Record the accepted-receipt date and obtain the buyer’s due-date interpretation. The completed screen should leave three separate answers: who placed the supply order, who authorized installation and when each invoice became acceptable.
Craft careers and apprenticeship access
For field work, start with Rosendin’s electrician location directory, not the supplier portal. It organizes employer pages by state and local union. The Austin page illustrates the route: it identifies inside-wireman recruiting and asks about experience and willingness to work on projects more than 100 miles away. It does not identify a particular campus assignment.[30][31]
Rosendin’s June 11, 2026 apprenticeship article says prior electrical experience is not required.[7] Applicants must be at least 18 and have a high school diploma or GED. It also lists Algebra I with a C or better, basic reading skills and a driver’s license. Other requirements include background and drug screening, lifting 50-plus pounds and climbing ladders.[7] Ask the local training program about its full admission process and accommodation requests.
The Electrical Training Alliance explains that applications go to the local Joint Apprenticeship and Training Committee, or JATC, and that local requirements can differ. Its typical requirements include a qualifying aptitude-test score. Use its training-center locator to find the appropriate program.[22][34]
Austin provides a concrete comparison. The Austin Electrical Training Alliance apprentice program lasts four years, with classroom and on-the-job training.[35] It lists a $35 application fee; tuition is announced before classes. Applicants take an aptitude test and attend an interview. The program selects them in ranked order until class capacity is met.[35] Acceptance does not guarantee placement with Rosendin. Check the current application schedule and costs directly. “No experience required” does not mean automatic admission.
For estimating, BIM, engineering, safety or project-management work, use Rosendin’s official position search. The careers page separates those paths from skilled craft and internships.[16][29] This report verified public routes and selected intake fields without submitting applications. It does not certify remaining vacancies, available training seats, individual pay or eligibility for ESOP benefits.
Sources, updates and corrections
This guide combines company and owner announcements, current public process pages and a dated supplier guide. Undated portfolio entries establish the described experience, not today’s progress. Private bid documents, negotiated contracts, complete legal ownership records and current license standing were not reviewed.
For another project to screen, use the data center project finder, where each report retains its own research date. For a correction or to supply additional information, contact Echelon Reports with the company or project name, source document and relevant date. Send applications and qualification records only through the official routes above.
Sources
- [1] Employee-Owned | Rosendin
- [2] Rosendin Holdings Announces Collaborative Leadership Structure Focused on Purposeful Growth (Press Releases) | Rosendin
- [3] Company | Modular Power Solutions (MPS)
- [4] Trade Partners | Rosendin
- [5] General Inquiries | Rosendin
- [7] Electrical Apprenticeship Requirements: What You Need to Get Started (Blog) | Rosendin
- [8] Semiconductor | Rosendin
- [9] Energy | Rosendin
- [10] UCSF Parnassus Hospital in San Francisco, California (The Regents of the University of California) | Rosendin
- [11] Arevon and Rosendin Complete Townsite Solar-plus-Storage Project | Arevon
- [15] Office Locations | Rosendin
- [16] Join Our Team | Rosendin
- [17] SoFi Stadium in Inglewood, California (STADCO LA LLC) | Rosendin
- [18] Valley Metro Tempe Streetcar in Tempe, Arizona (Valley Metro RPTA) | Rosendin
- [19] UC Davis Aggie Square in Sacramento, California (WEXFORD SCIENCE & TECHNOLOGY) | Rosendin
- [20] MAZ Mesa Data Center in Mesa, Arizona (Confidential) | Rosendin
- [22] electrical training ALLIANCE || Training || Apprenticeship Training
- [25] Rosendin Electric, Inc. Announces New Mountain West Regional Headquarters in Chandler (Press Release) | Rosendin
- [26] Contact | Modular Power Solutions (MPS)
- [27] How does my company enroll with Highwire? – Highwire Help Center
- [28] Annual Subscription Pricing for Contractors – Highwire Help Center
- [29] Apply Now | Rosendin
- [30] Local Electrician Jobs: Search Rosendin Locations Nationwide
- [31] Rosendin Austin craft intake
- [32] Rosendin supplier invoicing guide, effective July 18, 2022
- [33] Crusoe wins DCD North American data center award | Crusoe
- [34] electrical training ALLIANCE || Locate A Training Center
- [35] Apprentice Program – Austin Electrical Training Alliance
- [37] UCSF selects Herrero Boldt Webcor
- [39] Accounts Payable | Rosendin
- [41] Partnership Opportunities | Modular Power Solutions