Holder Construction uses trade partners for complex building systems while performing selected scopes with its own crews.[3][12] Its published capabilities include structural concrete, rough carpentry, hot-aisle containment, modular walls and site support.[12] To pursue work, start with Holder’s Trade Partners page, then establish whether your firm would bid directly or through another contractor. The corporate page links regional qualification routes; project teams define their own buying tiers.[3][20]
That combination matters when choosing what to sell. A concrete contractor, controls specialist and equipment vendor should establish which scope Holder intends to perform, purchase directly or place with another trade contractor. The most useful introduction names the project, the work offered and the boundary between supplied equipment and installed work.
Research checked November 10, 2026. This guide covers selected company operations and five project examples. It identifies purchasing and employment routes, not a list of confirmed open packages or unfilled jobs.
Qualification routes · Commercial terms · Pursuit worksheet · Projects · Workers and training
Where to start
| Your work | Supported route | First decision |
|---|---|---|
| Mechanical, electrical, controls or another construction trade | Holder’s Trade Partners page links regional prequalification pages and says it will contact firms that meet its minimum requirements.[3] | Identify the relevant project team and ask whether it is buying your complete scope or only part of it. |
| Equipment or building-system supply | Holder’s mechanical, electrical and plumbing (MEP)/building-technology team describes procurement, equipment purchasing and commissioning support.[12] | Ask whether Holder, a trade contractor or the owner will issue the order. A technical contact is not automatically the buyer. |
| Cleaning, dumpsters, trailers, portable toilets, equipment sales or rental, transport, security guards or staffing | The Atlanta qualification page says Holder is not soliciting these categories at the corporate level.[4] Its Ohio briefing separately described sub-tier opportunities with project primes.[39] | Request the project-specific buyer. Do not treat the corporate restriction as proof that these services are never purchased. |
| Small, minority-owned or women-owned firm | Holder’s supplier-engagement program encourages inclusion in contracts, subcontracts and miscellaneous purchases, including relationships with certified minority-owned and women-owned businesses.[5] | Pair your certification with a defined scope, service area and capacity. Ask which procurement channel fits. |
| Worker rather than business | Holder separates craft-job inquiries from trade-company qualification and directs craft applicants to its Indeed page.[4] | Use the worker section below. Do not send a personal job request through a subcontractor qualification route. |
Prequalification depends on the project and buying tier
Holder describes collaborative, open-book contracting with mechanical, electrical and controls firms.[3] Its corporate Trade Partners page offers eight regional links.[3] On November 10, the Atlanta destination displayed the corporate scope restrictions but no usable questionnaire in the rendered page. Use the relevant regional office to request the current secure form rather than assuming the page completed your registration.
The historical Ohio Regional Build Briefing was scheduled for August 27, 2026 in Portsmouth. Its Holder-hosted notice addressed local subcontractors, vendors and workforce partners, including sub-tier opportunities with project primes.[39] The date has passed. Its value now is the documented purchasing structure, not an invitation to a future event.
Two project sites explain that structure more precisely:
| Project route | Published qualification process | Boundary to preserve |
|---|---|---|
| HPTJV prequalification | HPT distinguishes prime subcontractors that can bid directly to the JV from sub-prime firms that bid to those contractors. Its stated criteria include bonding capability, comparable package size, financial documentation and ability to comply with the project labor agreement.[52] | The page says status follows the relevant trade’s qualification window. The bid page’s rendered body exposed no package dates during this review, so no current trade deadline is verified.[53] |
| Holder McFarland at Mann Hall | First-tier status permits direct bidding to Holder McFarland. Sub-tier firms must seek participation through a prequalified first-tier subcontractor.[20] | The page explicitly marks prequalification closed. Qualification for another project does not substitute for this project’s decision. |
At Burbank, the JV also publishes project-specific labor-agreement guidance and refers subcontractors to the HPT jobs coordinator and applicable trade unions for local hiring efforts.[54] Those are Burbank project arrangements, not evidence of a company-wide union rule.
A useful capability sheet should state your scope, territory, comparable jobs, available capacity and relevant certifications. For a sub-tier introduction, identify the first-tier package your offer supports. Request a secure document channel before sending financial statements.
Plan for site paperwork as well as qualification. Holder says its teams use HammerTech to upload safety documents, submit work permits, complete site orientation and manage site-specific safety plans, job hazard analyses and safety data sheets.[57] Ask the project team which records your scope requires and who must submit them before mobilization.
Commercial terms: obtain the actual agreement
This review did not establish a current company-wide Holder master subcontract or supplier purchase-order terms. Levelset’s subcontractor guide was last updated April 30, 2021. It discusses likely billing documents and historical payment scores, not Holder’s current contract.[22] Do not carry its old score, two-week response expectation or assumed billing process into a new order.
Use this screening table on the agreement actually offered. These are Echelon’s contract-review questions, not claims that Holder applies every listed clause.
| Decision | Documents or answer to request | Why it affects the quote |
|---|---|---|
| Who buys and who approves? | Legal buyer, purchase-order or subcontract form, scope matrix, incorporated documents and named change authority. | Keep equipment supply, installation and commissioning responsibilities clear. Identify which document takes priority if terms conflict. |
| What triggers payment? | Pay-application or invoice cutoffs, approval process, payment period, retainage, upstream-payment conditions and final-payment requirements. | Build a cash-flow plan around the actual trigger, not an assumed net-30 rule. |
| When are you committed? | Acceptance by signature, acknowledgment, shipment or starting work; treatment of your quotation exceptions. | Resolve price and scope differences before the contract treats performance as acceptance. |
| Who carries delivery and schedule risk? | Freight, unloading, storage, title and risk transfer, inspection, rejection, delay damages and acceleration terms. | Price the required handling and schedule obligations. Identify notice deadlines for delays outside your control. |
| How do changes and cancellation work? | Written authorization, notice periods, suspension rights, termination terms and recovery of committed materials. | Avoid buying inventory or adding labor on an undocumented instruction. |
| What closes the package? | Testing, commissioning, warranties, manuals, releases, final billing and any document-submission deadlines. | Include the labor and records required after physical installation. |
For labor-intensive packages, also ask which wage, bond, insurance, badging and labor-agreement requirements apply. Use qualified contract advice for enforceability and notice rights in the project’s jurisdiction.
A pursuit record you can reuse
Use one record for each package, not one for the whole company. Copy the questions below into your estimating notes. For each answer, record the confirming document, contact and date. Mark unanswered items “unknown” and assign a follow-up before committing estimating time or ordering materials. This is an Echelon screening aid, not a Holder application.
| Question to resolve | Source-backed example | What to record for your package |
|---|---|---|
| Which project, phase and scope is being bought? | Rowen’s award covers the Convergence Center, not all future development on its property.[30] | Project and package identifiers; current drawings and addenda; released scope; earliest required action and deadline. |
| Who can receive your bid and who will sign? | Mann Hall distinguishes direct first-tier bidders from sub-tier firms and marks its qualification period closed.[20] | Legal buyer; direct or sub-tier route; named package contact; written invitation or confirmation that another round is planned. |
| What will you supply, install or leave to others? | Holder lists structural concrete and hot-aisle containment among its own capabilities.[12] | Scope split for fabrication, delivery, installation, controls and commissioning; who buys major equipment; written exclusions. |
| What must be accepted before field work? | HPT lists bonding, package experience, financial documentation and labor-agreement compliance; Holder separately describes safety-document and orientation workflows.[52][57] | Qualification decision for this package; secure document route; applicable safety, labor and access requirements; responsible person and due date. |
| Can you price the terms actually offered? | The two Georgia registrations identify different legal forms; neither supplies the offered subcontract.[26][37] | Agreement version and buyer; invoice/payment trigger; retainage; change authority; delivery risk; unresolved exceptions and review owner. |
Keep project facts separate from your decisions. A completed worksheet helps frame the next conversation; only the purchasing team can confirm participation in its package.
Ownership and the legal name on the order
Holder identifies itself as privately held on its company LinkedIn profile.[36] Construction Dive reported on Forbes’ family-business list on May 21, 2026. Its table places Holder Construction at No. 65 and names the Holder family in the ownership column.[31] That supports a family-ownership description. It does not disclose individual stakes, voting control or a complete shareholder list. This research did not establish an employee-ownership percentage or a direct corporate-parent chain.
Two Georgia records make the legal-entity distinction concrete. HOLDER CONSTRUCTION COMPANY, control number K711360, is a domestic profit corporation formed March 31, 1997.[37] HOLDER CONSTRUCTION GROUP, LLC, control number 0026439, is a domestic limited liability company formed June 8, 2000.[26] Both records displayed Active/Compliance and the Riverwood Parkway office address when checked.[37][26] Those entity dates are separate from Holder’s stated business founding in 1960.[1]
Kennesaw State’s May 19, 2026 profile identifies Tommy Holder as chairman. It says Beth Lowry became president in 2022 and president and CEO in 2024.[23] Georgia Power also identifies Lowry as Holder’s president and CEO. Its May 29, 2026 announcement reports her election to the utility’s board.[10] The Georgia corporation record still lists Thomas M Holder in its CEO field.[37] That filing field does not resolve current operating leadership or establish share ownership.
For a quote or credit review, request the exact legal buyer, project identifier, invoice address and any written guarantee. Do not substitute a brand name, officer name or joint-venture partner for the company that will owe payment.
Sectors, offices and a documented investment
Holder’s current project menu spans data and telecom, aviation, corporate and commercial work, and higher education. It also lists interiors and adaptive reuse, public assembly, and science and technology. The project index also displays a Power & Energy category.[8] Georgia Tech published an account of a discussion with Lowry on September 4, 2025. It reported that 60-70% of Holder’s projects were tied to data centers.[11] That is a dated project-mix statement, not a measured November 2026 revenue share.
Updated November 16, 2026: Holder’s project-menu categories were checked against the official gallery. The Power & Energy card identifies a category, not a dated project award.
The work extends beyond large data-center shells. Holder describes laboratory construction with complex mechanical, electrical and plumbing systems, security requirements and commissioning.[18] Its aviation practice covers terminals, concourse expansions, airline clubs and renovations around ongoing airport operations.[17]
A recent investment points to another part of the business. In May 2026, Kennesaw State reported Holder’s investment to establish a $500,000 endowment for the university’s Research Consortium. It supports shared applied research across construction and architecture.[23] Lowry identified safety, productivity, artificial intelligence and robotics as areas of opportunity in that discussion.[23] This is a research commitment.
Holder’s current directory lists eight office markets. Use the offices for routing, rather than assuming each office controls every nearby project.[7]
| Office market | Published location | Telephone |
|---|---|---|
| Atlanta | 3300 Riverwood Parkway SE, Suite 1200, Atlanta, Georgia | 770.988.3000.[7] |
| Charlotte | 6210 Ardrey Kell Road, Suite 400, Charlotte, North Carolina | 704.357.4200.[7] |
| Columbus | 995 Yard Street, Suite 260N, Grandview Heights, Ohio | 614.289.8300.[7] |
| Dallas | 15455 Dallas Parkway, Suite 350, Addison, Texas | 972.870.4260.[7] |
| Denver | 6363 S Fiddlers Green Circle, Suite 1300, Greenwood Village, Colorado | 720.465.6020.[7] |
| Phoenix | 2325 East Camelback Road, Suite 520, Phoenix, Arizona | 602.224.5050.[7] |
| San Jose | 2099 Gateway Place, Suite 340, San Jose, California | 408.516.4401.[7] |
| Washington, D.C. | 2325 Dulles Corner Boulevard, Suite 1110, Herndon, Virginia | 703.796.4400.[7] |
The general inquiry number is 877.570.1133.[7] Ask for the project or preconstruction team responsible for your scope. The directory is not a trade-license census or a public bid register.
Selected projects and what their status means
The examples below show different buying structures and project stages. A joint venture is a project delivery relationship; the sources do not establish that its partners are Holder subsidiaries.
| Project | Documented role and dated evidence | Practical use |
|---|---|---|
| Project Dazzler, Franklin Furnace, Ohio | Google’s project site describes a proposed $1 billion, 500,000-square-foot data-center complex on Gallia Pike and links readers seeking construction opportunities to Holder’s homepage. It separately places the new substation under AEP.[21] | Start with Holder for construction routing, but keep the utility’s scope separate. The owner’s page does not identify every awarded trade contractor. |
| Hollywood Burbank Airport replacement terminal, California | The airport awarded the design-build agreement to Holder, Pankow, TEC Joint Venture in December 2022.[34] Corgan’s October 12, 2026 release describes the 14-gate, 355,000-square-foot facility as completed. It announces first flights for October 13.[32] | Treat the main terminal as a delivery-stage example, not an early construction bid lead. The airport directs construction inquiries to the HPTJV project site.[47] Ask about the exact remaining scope and procurement round. |
| The New SLC, Salt Lake City, Utah | The owner assigns HDJV, the Holder-Big-D joint venture, scopes including the terminal, Concourse A, utility plant, parking garage and central tunnel. It separately assigns Concourse B-west to Austin-Okland.[40] The airport’s October 28, 2026 release reports completion of the redevelopment program.[44] | Do not attribute all airport construction to Holder or use an old phased-construction schedule as a current opportunity. Distinguish new airport work from the completed program. |
| Mann Hall renovation, NC State, Raleigh | NC State’s June 4, 2026 report names Holder and McFarland as project leaders. It says renovation began in summer 2025 and forecasts reopening in fall 2027.[24] The project site says bidding for trade packages 1-32 and prequalification are closed.[19][20] | Use the project site to understand first-tier and sub-tier participation. Ask the team about a specific remaining requirement rather than treating a still-visible form link as an open round. |
| Rowen Convergence Center, Gwinnett County, Georgia | Rowen’s December 9, 2025 announcement selects Holder as construction manager at risk for a 10,000-square-foot facility. It forecasts construction in 2026 and completion in 2027.[30] Its July 7, 2026 update still describes the center as moving toward groundbreaking.[51] | Ask Atlanta’s team for the current package schedule. The supported award concerns the Convergence Center, not every future building on Rowen’s 2,000-acre property.[30] |
Mann Hall also shows why a portfolio description is not enough to price work. The university’s meeting page headed January 26, 2026 records a funding shortfall. It identifies the fourth-floor lab fit-out and first-year design maker lab as add alternates removed from the base scope.[29] Its internal date labels say 2025, an inconsistency the page does not resolve. Obtain the current drawings, accepted alternates and funding authorization before pricing those spaces.
For the Ohio campus’s broader context, read the Project Dazzler contractor report. This company guide concentrates on Holder’s operations and purchasing routes.
Workers: separate applications, training and dispatch
Holder’s Columbus MEP Engineer description was readable on November 10. It requires at least two years of commercial construction experience with sophisticated mechanical and electrical systems. It also requires extensive data-center and infrastructure management experience.[25] The role covers equipment purchasing, submittals, estimates and coordination. It is not an entry-level craft role or a confirmed Dazzler assignment.[25]
The matching application page rendered a form with the same role and Columbus location.[50] The description does not state numerical pay or a posting date in the inspected body or role metadata. No application was submitted, and remaining headcount was not confirmed.
| Applicant | Useful route | What to establish next |
|---|---|---|
| Experienced craft worker | Holder’s Atlanta trade page directs workers to Holder on Indeed.[4] The Holder careers page is the employer-owned fallback.[6] | Confirm employer, exact jobsite, pay, shift and referral requirements. The current-opportunities index rendered no listings in this review, and an indexed carpenter page rendered blank. Neither establishes that hiring has stopped. |
| High-school student | HolderRISE is Holder’s paid internship program for ages 16-17, with field-supervision exposure and activities involving safety, quality, layout and virtual design and construction.[13] | Ask the regional office about participating schools, dates and remaining places. The program page does not verify open intake at a particular project. |
| Ohio beginner seeking a laborer apprenticeship | The Ohio Laborers’ application instructions require age 18 or older, a valid driver’s license, high-school diploma/GED, drug-free status and reliable transport. They describe employer sponsorship and local-union approval before employment.[55] | Ask about local demand before planning a start date. The instructions require reapplication and document re-upload if no union hall or contractor responds within 90 days.[55] This is an independent training route, not a Holder job offer. |
| Portsmouth or Columbus apprenticeship inquiry | The training trust lists Joe Coleman as regional coordinator for Portsmouth Local 83 and Columbus Local 423: 740.501.4624, joec@oltc.org.[45] | Ask about intake and the applicable local’s referral process. This review did not verify a live Holder dispatch call. |
Local hiring at Dazzler deserves a specific check. On October 29, 2026, Scioto County Daily News reported Commissioner Merit Smith’s account of a site visit. Smith said a Holder representative had not seen the county’s local-hiring agreement and promised to investigate complaints.[28] That is a report of the commissioner’s account, not a finding that Holder breached a contract. Google’s project page separately states that it will advertise locally and prioritize Scioto County and Southern Ohio employment.[21] Ask the actual employer or union about present referrals. The commitment alone does not secure a position.
Make one targeted approach
Send the project team a capability sheet and the specific unresolved questions from your pursuit record. For a worker, start with the employer or training route that matches your experience, then confirm the jobsite and hiring process.
If the decision involves comparing contractors, tracing project participants or evaluating a market, discuss custom research with Echelon Reports. Scope, evidence, deliverables and price are agreed for the specific question.[43]
For a correction or to supply additional information, contact Echelon Reports with the company or project, relevant date and a public source or document.
Coverage and limits
This guide uses company disclosures, owner and university records, Georgia entity records, project-team pages and selected reporting. It does not establish a complete ownership chart, license inventory, private contract terms, current bid-package list or available workforce. No private bid rooms or company confirmations were used.
Several routes remain incomplete: the corporate qualification questionnaire and jobs index did not render usable content; one carpenter record was blank; project bid dates were not exposed. The Rowen start date, current Mann Hall alternates and the underlying Dazzler local-hiring agreement were not verified. Historical announcements and undated program pages retain their own limits. Recheck the relevant procurement or hiring route before acting.
Sources
Dates below are source publication dates unless otherwise noted. Undated pages were checked November 10, 2026.
- [1] Holder Construction: company homepage. Undated.
- [3] Holder: Trade Partners. Undated.
- [4] Holder: Atlanta prequalification. Undated.
- [5] Holder: Supplier Engagement. Undated.
- [6] Holder: Careers. Undated.
- [7] Holder: Contact and offices. Undated.
- [8] Holder: Projects. Undated.
- [10] Georgia Power: Beth Lowry elected to board. 2026-05-29.
- [11] Georgia Tech: Tech Talks Business with Beth Lowry. 2025-09-04.
- [12] Holder: Expertise and self-perform capabilities. Undated.
- [13] Holder: Workforce Development and HolderRISE. Undated.
- [17] Holder: Aviation and Transportation. Undated.
- [18] Holder: Science and Technology. Undated.
- [19] Holder McFarland: Mann Hall project. Undated.
- [20] Holder McFarland: Mann Hall prequalification. Undated.
- [21] Google: Project Dazzler information. Undated.
- [22] Levelset: Holder Construction subcontractor guide. 2021-04-30 (updated).
- [23] Kennesaw State: Holder investment in shared research. 2026-05-19.
- [24] NC State: Mann Hall renovation. 2026-06-04.
- [25] Holder: Columbus MEP Engineer description. Undated.
- [26] Georgia registry: HOLDER CONSTRUCTION GROUP, LLC. Undated.
- [28] Scioto County Daily News: local-hiring agreement report. 2026-10-29.
- [29] NC State: Campus Development meeting, January 26. 2026-01-26 (page heading; internal labels conflict).
- [30] Rowen: Convergence Center contractor selection. 2025-12-09.
- [31] Construction Dive: Forbes family-business list. 2026-05-21.
- [32] Corgan: Hollywood Burbank terminal release. 2026-10-12.
- [34] ElevateBUR: airport project and award history. Undated.
- [36] Holder company profile on LinkedIn. Undated.
- [37] Georgia registry: HOLDER CONSTRUCTION COMPANY. Undated.
- [39] Holder-hosted Ohio Regional Build Briefing. 2026-08-27 (event date).
- [40] SLC Airport: The New SLC fact sheet. Undated.
- [43] Echelon Reports: custom intelligence research. Undated.
- [44] SLC Airport: redevelopment completion release. 2026-10-28.
- [45] Ohio Laborers: apprenticeship coordinators. Undated.
- [47] ElevateBUR: bid-opportunity routing. Undated.
- [50] Holder: Columbus MEP Engineer application. Undated.
- [51] Rowen: July 2026 leadership transition and project update. 2026-07-07.
- [52] HPTJV: prequalification. Undated.
- [53] HPTJV: contractor bid opportunities. Undated.
- [54] HPTJV: project labor-agreement guidance. Undated.
- [55] Ohio Laborers: apprenticeship application instructions. Undated.
- [57] Holder: safety documentation and technology. Undated.